Framing up unit 9
Roof
Getting the building wrap on - unit 8 then 9
Internal guttering on the roof
Top floor bathroom - unit 8
Cantilevered deck
Units 8 and 9
Framing up unit 9
Getting the building wrap on - unit 8 then 9
Internal guttering on the roof
Door moved from the right to the left
Things didn't look too bad to start with...
Deck and stairs
Bench seat with lift up top so you can put things inside.
The silver part in the middle is the range hood which we suspended.
We've always got a couple of jobs on the go at once, but the biggest job we have at the moment is a total renovation of an an villa in front of the town houses we built. 